Your location:

/ Valve products / safety valve / Lever Safety Valve / GA42Y Single Lever Safety Valve
全国销售热线:0577-67378222

Product classification of Kaiweixi

KAI WEI XI CHAN PIN FEN LEI
  • GA42Y Single Lever Safety Valve

  • More Lever Safety Valve>>

  • More safety valve>>

  • More valve>>

Contact Us
  • Phone:+86(577)6730 7899
  • Mobile:+86 15068444310
  • Fax:+86(577)6738 7099
  • Email:merry@kaiweixi.com
  • Address:No. 1, Linxia Road, Oubei Street, Yongjia County, Wenzhou City, Zhejiang Province,china
  • Website:https://www.kaiweixi.com
Other valve products you may need
  • A51H Single-Lever Safety Valve
  • GA44H Double-Lever Safety Valve
GA42Y Single Lever Safety Valve

GA42Y Single Lever Safety Valve

  • Model:GA42Y-16C/GA42Y-25C/GA42Y-40C/GA42H-16C/GA42H-25C/GA42H-40C
  • Specification:DN50
  • Temperature:≤ 200 ℃
  • Medium:steam, air
  • Pressure: PN16-PN40
  • Connection method:flange
  • Driving method:spring type
  • Material:Cast steel
x

Add QR code to serve you!

x

Add QR code to serve you!

x

Add QR code to serve you!

x
GA42Y Single Lever Safety ValveOverview

The AH42F safety reflux valve is a composite valve that integrates safety relief and medium reflux functions. It is typically installed at the outlet of a pump or on pipelines requiring pressure protection. When the pipeline pressure exceeds the set safety value, the valve opens as a safety valve to relieve pressure. When the pump suddenly stops or the downstream pressure is higher than the upstream pressure, the valve can act as a check valve to allow limited reflux of the medium, preventing water hammer, system backflow, and pump reversal. The "F" in the valve model indicates that the valve seat sealing surface is directly machined from the valve body material. This valve simplifies pipeline design and provides integrated safety protection and hydraulic control for pumps and pressure systems. It is mainly installed in the outlet pipelines of centrifugal pumps, water supply systems, fire pump sets, irrigation systems, and industrial circulating water systems. It is used to prevent system overpressure, avoid the hazards of water hammer during pump shutdown, and prevent damage to the pump caused by medium backflow. It is a commonly used multifunctional protection valve in pump pipelines.


GA42Y Single Lever Safety Valve Product Diagram



GA42Y Single Lever Safety ValveCharacteristic


Features:

1. Lever and weight mechanism, with stable and intuitive pressure setting

By adjusting the position of the weight on the lever, the opening pressure can be directly and linearly set and locked. The set value is not affected by spring relaxation or temperature, exhibiting excellent long-term stability and low maintenance requirements.

2. Tungsten carbide seal (Type "Y")

The sealing surface between the valve disc and the valve seat is deposited with hard alloys such as Stellite, which boasts extremely high hardness, wear resistance, and high temperature resistance. It is suitable for harsh media such as steam and offers a long sealing life.

3. The structure is simple and sturdy, with strong anti-interference capability

It is mainly composed of a lever, a fulcrum, a heavy hammer, and a valve body and disc. The mechanical structure is simple and sturdy, insensitive to medium pollution and environmental vibration, and highly reliable.

4. High-capacity potential

The lever mechanism can drive the larger-sized valve disc to achieve a fully open action, providing a larger discharge area and relief capacity, suitable for high-flow discharge of steam and gas.

5. No external power required, intrinsically safe

It operates entirely based on gravity and lever principles, without requiring springs, air sources, or power sources. It is suitable for explosion-proof applications where there is no reliable power source or where intrinsic safety is required.

GA42Y Single Lever Safety Valvestructure principle

GA42Y Single Lever Safety Valve Structural Diagram

Part Name Material

NO.零件名称 Name of part材料 Materials
1阀体Body碳钢 Carbon Steel
2导 向 套Guide sleeve不锈钢 Stainless steel
3阀瓣Disc2Cr13
4阀杆Stem2Cr13
5杠杆lever碳钢 Carbon Steel
6重锤Hammer铸铁 Cast iron


GA42Y Single Lever Safety Valvetechnology parameter


Performance Specifications Table

公称压力nominal pressure壳体试验Shell Test密封试验Sealing Test开启压力opening pressure适用介质Application medium适宜温度Applicationtemperature
1.62.40.9PK用户确定User confirmed液化气、天然气等非腐蚀性介质Non-corrosive media such as liquefied gas and natural gas-40~+80℃
2.53.75
4.04.4



GA42Y Single Lever Safety Valvestandard size

GA42Y Single Lever Safety Valve Outline Drawing

Dimension Chart

型号 Type公称通径 Nominal diameter DN(mm)尺寸 Dimensions
do=zDD1D2D8If1bZ=φdHLDN'D2'D1'D'n=Md2K2K3D3
GA42H-165040×1165125100/3/164-184128401251752002358-M16120145162190
GA42H-255040×1165125100/3/204-184128401251752002358-M16120145162190
GA42H-405040×11651251008834204-184128401251752002358-M16120145162190
GA42H-645040×11751351058834264-234208401251752002358-M16120145162190
GA42H-1005040×11951451128834284-254208401251752002358-M16120145162190